質問 # 36
Can an it_project_manager convert a task to a milestone?

  • A. No, this can only be done by a system admin.
  • B. Yes, by right-clicking on the task in the Planning Console.
  • C. No, the PPS admin role is also required.
  • D. Yes, if the task is assigned to the project manager.

正解:B

解説:
Explanation
According to the Planning Console document, an it_project_manager can convert a task to a milestone by right-clicking on the task in the Planning Console and selecting Convert to Milestone. The other options are not correct, as they are not the ways to convert a task to a milestone. A system admin or a PPS admin role is not required for this action. The task assignment is not relevant for this action.


質問 # 37
A project expense line is cost associated with a specific source, except for:

  • A. Software.
  • B. Program.
  • C. Fixed Assets.
  • D. Resource.

正解:B

解説:
Explanation
According to the Project Expense Lines document, a project expense line is cost associated with a specific source, such as fixed assets, resource, or software. The program field on the project expense line form is not a source of cost, but a reference to the program that the project belongs to. Therefore, the correct answer is B.
Program. The other options are not correct, as they are sources of cost for a project expense line.


質問 # 38
Which role can configure the parameters of the demand workbench that is provided with the base system?

  • A. All roles.
  • B. business_stakeholder.
  • C. it_pps_admin.
  • D. it_project_manager.

正解:C

解説:
Explanation
According to the Demand Workbench document, the role that can configure the parameters of the demand workbench that is provided with the base system is it_pps_admin. This role grants access to the Project Portfolio Suite application and allows the user to configure the demand workbench settings, such as the axes, the quadrants, the bubble size, and the color. The other options are not correct, as they are not roles that can configure the parameters of the demand workbench. The all roles option is too broad and does not specify a particular role. The business_stakeholder role grants access to the Business Stakeholder Portal and allows the user to view and submit demands. The it_project_manager role grants access to the Project Portfolio Management application and allows the user to create and update projects.


質問 # 39
A user's availability is calculated as:

  • A. Sum of allocated and confirmed hours, divided by the total capacity
  • B. Allocated hours divided by the total capacity
  • C. Capacity minus allocation
  • D. Allocated time

正解:B

解説:
Explanation
According to the ServiceNow documentation1, a user's availability is calculated as the ratio of allocated hours to total capacity, expressed as a percentage. Allocated hours are the hours that a user is assigned to work on a project or demand. Total capacity is the maximum number of hours that a user can work in a given period, based on their schedule and availability profile. A user's availability indicates how much of their time is already allocated and how much is still available for new assignments.
1:
https://docs.servicenow.com/bundle/vancouver-it-business-management/page/product/resource-management/con


質問 # 40
Which role is needed to group related projects and demands?

  • A. it_project_manager
  • B. it_demand_manager
  • C. it_project_user
  • D. it_program_manager

正解:D

解説:
Explanation
According to the ServiceNow documentation1, the it_program_manager role is needed to group related projects and demands. This role can create and manage programs, which are containers for projects and demands that share a common goal or objective. The other options are incorrect because:
B: it_project_manager: The it_project_manager role can create and manage projects, but not group them into programs2.
C: it_demand_manager: The it_demand_manager role can create and manage demands, but not group them into programs3.
D: it_project_user: The it_project_user role can view and edit project tasks, but not create or manage projects, demands, or programs4.
1:
https://docs.servicenow.com/bundle/vancouver-it-business-management/page/product/project-portfolio-managem
https://docs.servicenow.com/bundle/vancouver-it-business-management/page/product/project-management/conc
https://docs.servicenow.com/bundle/vancouver-it-business-management/page/product/demand-management/conc
https://docs.servicenow.com/bundle/vancouver-it-business-management/page/product/project-management/refer


質問 # 41
The combination of the user and the assigned portfolio must be unique when adding a user to which registry?

  • A. Application Registry.
  • B. Stakeholder Registry.
  • C. Event Registry.
  • D. UX Page Registry.

正解:B

解説:
Explanation
According to the Stakeholder Registry document, the combination of the user and the assigned portfolio must be unique when adding a user to the stakeholder registry. The stakeholder registry is a table that stores information about the stakeholders of a portfolio. The other options are not correct, as they are not registries that require a unique combination of user and portfolio. The application registry is a table that stores information about the applications in the system. The event registry is a table that stores information about the events that trigger notifications. The UX page registry is a table that stores information about the UX pages that are available for portfolios.


質問 # 42
If a sub-project and parent project have different project currencies, this property should be set to true for cost roll-ups.

  • A. com.snc.project.calculate_roi
  • B. com.snc.project.copy.additional_attributes
  • C. com.snc.project.rollup_project_start_date
  • D. com.snc.project.multicurrency.rollup_if_different

正解:D


質問 # 43
Using the Request type field on a resource plan, which options can be used to request a resource?
Choose 3 answers

  • A. Hours
  • B. Month
  • C. Day
  • D. FTE
  • E. Person Days

正解:A、D、E

解説:
Explanation
Using the Request type field on a resource plan, you can request a resource by specifying the amount of FTE, person days, or hours that you need for a task or a project. FTE stands for full-time equivalent and represents the percentage of a standard work week that a resource can perform. Person days are the number of days that a resource works on a task or a project. Hours are the number of hours that a resource works on a task or a project. You can find more information about the Request type field in the Product Documentation for ServiceNow.


質問 # 44
If Scenario Planning for PPM is installed, a portfolio manager can access the Portfolio Planning Workbench by navigating to which of the following?
Choose 2 answers

  • A. Portfolio Planning Workbench module
  • B. Program Workbench
  • C. Project module
  • D. Portfolio Planning related link

正解:A、D

解説:
Explanation
According to the Scenario Planning for PPM document, a portfolio manager can access the Portfolio Planning Workbench by navigating to either the Portfolio Planning related link on the portfolio form or the Portfolio Planning Workbench module under the Portfolio Planning application menu. The other options are not correct, as they do not lead to the Portfolio Planning Workbench. The Project module is under the Project Portfolio Management application menu and the Program Workbench is under the Program Management application menu.


質問 # 45
What is a resource event?

  • A. A non-scheduled activity impacting capacity.
  • B. An event scheduled by a project manager.
  • C. An external event.
  • D. A block of time that a resource spends on a task.

正解:A

解説:
Explanation
A resource event is a non-scheduled activity that affects the availability and capacity of a resource or a group of resources. Examples of resource events are vacations, holidays, training, or sick leave. Resource events can be created by resource managers or resources themselves, and they can be viewed in the resource calendar or the resource workbench. You can find more information about resource events in the Product Documentation for ServiceNow.


質問 # 46
In order to map custom fields from Microsoft Project to ServiceNow when importing a project, you must first:

  • A. Create custom fields in your ServiceNow instance
  • B. Import your project
  • C. Configure the Project form
  • D. Export the project to XML format

正解:A

解説:
Explanation
In order to map custom fields from Microsoft Project to ServiceNow when importing a project, you must first create custom fields in your ServiceNow instance that match the names and data types of the custom fields in Microsoft Project. This will allow you to map the custom fields using a transform map when importing the project. You can find more information about this process in the Product Documentation for ServiceNow.


質問 # 47
Where is planned cost calculated from when requesting resources from a group and when resource role is specified?

  • A. The distribution costs
  • B. The hourly rate of the specified role.
  • C. The task rate cards.
  • D. The CI rate cards.

正解:B

解説:
Explanation
According to the ServiceNow documentation1, when requesting resources from a group and when resource role is specified, the planned cost is calculated from the hourly rate of the specified role. The system uses the rate card associated with the resource plan to determine the hourly rate for each role. The other options are incorrect because:
A: The distribution costs: The distribution costs are the costs that are distributed across the project tasks based on the resource plan allocation2.
B: The task rate cards: The task rate cards are the rate cards that are applied to the project tasks, not the resource plan3.
D: The CI rate cards: The CI rate cards are the rate cards that are applied to the configuration items, not the resource plan4.
1:
https://docs.servicenow.com/bundle/vancouver-it-business-management/page/product/resource-management/con
https://docs.servicenow.com/bundle/vancouver-it-business-management/page/product/resource-management/con
https://docs.servicenow.com/bundle/vancouver-it-business-management/page/product/resource-management/con
https://docs.servicenow.com/bundle/vancouver-it-business-management/page/product/resource-management/con


質問 # 48
If a sub-project and parent project have different project currencies, this property should be set to true for cost roll-ups.

  • A. com.snc.project.calculate_roi
  • B. com.snc.project.copy.additional_attributes
  • C. com.snc.project.rollup_project_start_date
  • D. com.snc.project.multicurrency.rollup_if_different

正解:D

解説:
Explanation
According to the ServiceNow documentation1, this property controls whether the cost roll-ups are performed when a sub-project and parent project have different project currencies. If this property is set to true, then the system converts the sub-project currency to the parent project currency using the exchange rate table and performs the cost roll-ups. If this property is set to false, then the system does not perform the cost roll-ups for sub-projects with different currencies.
1:
https://docs.servicenow.com/bundle/vancouver-it-business-management/page/product/project-management/refer


質問 # 49
What is a data copy of the current project's task, schedule, or structure that can be used for comparison reporting later?

  • A. Baseline
  • B. Forecast
  • C. Commitment
  • D. Accrual

正解:A

解説:
Explanation
A baseline is a data copy of the current project's task, schedule, or structure that can be used for comparison reporting later. A baseline captures the original plan of the project and allows you to track the changes and deviations from the plan over time. You can create multiple baselines for a project and compare them with the current state of the project. You can find more information about baselines in the Product Documentation for ServiceNow.


質問 # 50
Is resource capacity derived from FTE or schedules?

  • A. Both.
  • B. Only Schedules.
  • C. Neither.
  • D. Only FTE.

正解:B

解説:
Explanation
Resource capacity is the total number of hours that a resource or a group of resources is available for work in a given time period. According to the Product Documentation for ServiceNow, resource capacity is derived from the user or group schedule, which defines the working hours and days for each resource. The group capacity is rolled up from the schedules of all the members. Note: Capacity is not derived from FTE, but from schedules. Both FTE and schedules must be in synchronization with each other. FTE is a measure of how much work a resource can perform in a standard work week, and it is used to calculate the resource demand and allocation.


質問 # 51
......

100%更新されたのはServiceNow CIS-SPM限定版PDF問題集:https://www.jpntest.com/shiken/CIS-SPM-mondaishu

無料CIS-Strategic Portfolio Management CIS-SPM公式認定ガイドPDFダウンロード:https://drive.google.com/open?id=1qIf37DJgQbqQ_nBYjBkdHGMu5Vr5Lmmm

弊社を連絡する

我々は12時間以内ですべてのお問い合わせを答えます。

オンラインサポート時間:( UTC+9 ) 9:00-24:00
月曜日から土曜日まで

サポート:現在連絡