質問 # 17
True or False: A team should change their WIP limit, at the Daily Scrum, if an urgent unplanned item enters a Sprint and the team is at the maximum WIP limit.
- A. TRUE
- B. FALSE
正解:B
質問 # 18
True or False: If Developers use tasks, then their WIP limits should primarily apply to tasks in the Sprint Backlog.
- A. True
- B. False
正解:B
質問 # 19
Kanban for Scrum Teams is built upon which Scrum Values? (choose the best three answers)
- A. Transparency
- B. Focus
- C. Courage
- D. Professionalism
- E. Openness
正解:B、C、E
質問 # 20
Work Item Age is best described as: (choose the best answer)
- A. The amount of elapsed time between when a work item entered the Product Backlog and the current time.
- B. The amount of elapsed time between when a work item "started" and the current time.
- C. The amount of elapsed time between when a work item entered the Sprint Backlog and the current time.
- D. The amount of elapsed time between the start of the Sprint and the current time.
正解:B
質問 # 21
Which of the following best describes Kanban? (choose the best answer)
- A. A process of defining a Scrum Team's workflow in order to increase productivity.
- B. A strategy for optimizing the flow of value through a process that uses a visual, Work in Progress (WIP) limited pull system.
- C. Additional practices that are integrated into the Scrum framework.
- D. None of the above.
正解:B
質問 # 22
True or False: Cycle Time is a direct leading indicator for the length of the Scrum Team's feedback loop for a Product Backlog item.
- A. True
- B. False
正解:B
質問 # 23
True or False: A Scrum Team's future output can be determined with Little's Law.
- A. TRUE
- B. FALSE
正解:B
質問 # 24
Work Item Age metrics are most helpful in supporting which of the following? (choose the best two answers)
- A. Inspecting and adapting the Sprint at the Daily Scrum.
- B. Inspecting and adapting the team's process and definition of Workflow at the Sprint Retrospective.
- C. Helping the team estimate the size of Work Items.
- D. Influencing the team's Service Level Expectation (SLE).
- E. Being a leading indicator for the length of the feedback loop for a certain Work Item.
正解:A、E
質問 # 25
True or False: Cycle Time is a lagging indicator.
- A. False
- B. True
正解:B
質問 # 26
Which of the following is NOT a metric of flow for Scrum Teams using Kanban? (choose the best answer)
- A. Throughput.
- B. Work in Progress (WIP).
- C. Cycle Time.
- D. All of the above are flow metrics.
- E. Work Item Age.
正解:D
質問 # 27
A Kanban board is comprised of which of the following policies? (choose the best two answers)
- A. Class of service policy.
- B. Work in Progress (WIP) Limits.
- C. Each Product Backlog Item type has a separate swim lane.
- D. Your workflow visualization.
正解:B、D
質問 # 28
What can happen if the Scrum Team's Work In Progress (WIP) Limit is not honored? (choose the best answer)
- A. Concurrent operations will slow down.
- B. Team throughput increases.
- C. Feedback loops become shorter.
- D. Processes will suffer from inefficiency.
正解:D
質問 # 29
Work in Progress (WIP) is: (choose the best answer)
- A. The total of all items in the Product Backlog.
- B. The number of PBI's that meet the team's definition of "Ready".
- C. Equal to the number of PBI's in the Sprint Backlog.
- D. The number of work items started but not finished (according to the Scrum Team's definition of "Workflow").
正解:D
質問 # 30
True or False: In a flow-based system, the number of tasks is not necessarily limited, rather the amount of value-generating work items is limited.
- A. False
- B. True
正解:B
質問 # 31
In the middle of a Sprint, a Product Owner has requested the Developers to add a new urgent item to their Sprint Backlog. The team is currently at their WIP Limit.
Which would be the two most appropriate responses? (choose the two best answers)
- A. Add the urgent item to their Sprint Backlog but only start working on that new item when enough room frees up.
- B. Adjust the WIP Limits to allow for taking on the extra item and update their definition of Workflow.
- C. Reject the urgent item because the WIP Limits do not allow it. Tell the Product Owner to wait until the next Sprint.
- D. Take on the urgent item as an exception to the WIP Limits, pushing this item along on top of the existing flow and note a WIP exception.
正解:A、D
質問 # 32
True or False: The Sprint Retrospective is the only time in which the Work in Progress (WIP) Limit can change.
- A. TRUE
- B. FALSE
正解:B
質問 # 33
What would be the most opportune time for a Scrum Team to make policy changes to their Work in Progress (WIP) Limits? (choose the best answer)
- A. Anytime during the Sprint.
- B. During the Daily Scrum.
- C. During the Sprint Retrospective.
- D. WIP Limits should not be modified once they have been set.
正解:C
質問 # 34
A team is using Kanban to improve the Sprint flow by visualizing and managing flow in the Sprint Backlog.
Which of the following would be most helpful to visualize?
- A. Flow of Product Backlog items.
- B. Flow of Story Points.
- C. Flow of invested effort.
- D. Flow of only User Stories.
- E. Flow of tasks.
正解:A
質問 # 35
Which of the following metrics will likely be reviewed by at the Daily Scrum for a Scrum Team using Kanban? (choose the best two answers)
- A. Lead Time.
- B. Work in Progress (WIP).
- C. Throughput.
- D. Cycle Time.
- E. Work Age Item.
- F. Velocity.
正解:B、E
質問 # 36
Who is accountable for managing the Kanban board in the Sprint Backlog? (Choose the best answer)
- A. The Product Owner
- B. The Scrum Master
- C. The Developers
- D. The Scrum Team
正解:C
質問 # 37
......
「Scrum PSK-I試験」は、ScrumおよびKanbanのメソッド論の知識とスキルを向上させたいプロフェッショナルを対象とした認定試験です。この試験は、Scrumの基本的な理解を持ち、アジャイルおよびリーンな実践領域での知識を拡大したい個人に適しています。この試験は、アジャイルプロフェッショナルのためのトレーニングおよび認定プログラムを提供するリーディングな組織、Scrum.orgによって運営されています。
無料でゲット!2024年最新のに更新されたScrum PSK-I試験問題と解答:https://www.jpntest.com/shiken/PSK-I-mondaishu
合格させるPSK-I試験には更新された140問題あります:https://drive.google.com/open?id=1lhoR5-5bOtgxr56-iQITrwLoiEpP85Cv