[2022年04月]更新のPSM-I試験問題と有効なPSM-I問題集PDF

PSM-Iブレーン問題集学習ガイドにはヒントとコツで試験合格を目指そう

質問 80
A new developer is having continuing conflicts with existing Development Team members and creating the hostile environment. If necessary, who is responsible for removing the team member?

  • A. The Product Owner is responsible, because he/she controls the return on investment (ROI).
  • B. The Scrum Manager is responsible, because he/she removes Impediments.
  • C. The Development Team is responsible, and may need help from the Scrum Master.
  • D. The hiring manager is responsible, because he/she hired the developer.

正解: B

 

質問 81
Which statement best describes the Sprint Backlog as outcome of the Sprint Planning?

  • A. Every item has a designated owner.
  • B. It is the Development Team's plan for the Sprint.
  • C. It is a complete list of all work to be done in a Sprint.
  • D. It is ordered by the Product Owner.
  • E. Each task is estimated in hours.

正解: C

 

質問 82
The Scrum Master observes the Product Owner struggling with ordering the Product Backlog. What is an appropriate action for the Scrum Master to take? (Choose the best answer.)

  • A. Present the Product Owner with an ordered Product Backlog to use.
  • B. Offer the Product Owner help in understanding that the goal of ordering the Product Backlog is to maximize value.
  • C. Suggest the Product Owner extend the Sprint, so he can have more time to order the Product Backlog.
  • D. Encourage the Product Owner to work with the Development Team to see which items technically are fastest to implement.
  • E. Suggest that the Development Team does the ordering to be sure that it is a feasible ordering of work.

正解: E

 

質問 83
When is it most appropriate for a Development Team to change the definition of "Done"?

  • A. Prior to starting a new project.
  • B. During the Sprint Retrospective.
  • C. During Spring Planning.
  • D. Prior to starting a new Sprint.

正解: B

 

質問 84
What is included in the Sprint Backlog? (Choose the best answer.)

  • A. Use Cases.
  • B. Tasks.
  • C. Tests.
  • D. Any of the above (or others) which are a decomposition of the selected Product Backlog items.
  • E. User Stories.

正解: D

 

質問 85
A Sprint Retrospective should be held:

  • A. At the end of each Sprint.
  • B. Only when the Scrum Team determines it needs one.
  • C. At the beginning of each Sprint.
  • D. At the end of the last Sprint in a project or a release.

正解: A

 

質問 86
Scrum is a methodology that tells in detail how to build software incrementally.

  • A. True
  • B. False

正解: B

 

質問 87
A product Increment must be released to production at the end of each Sprint.

  • A. True
  • B. False

正解: B

 

質問 88
Which are properties of the Daily Scrum? (Choose two.)

  • A. It consists of the Scrum Master asking the Team members the three questions.
  • B. Its location and time remain constant.
  • C. It is free from and designed to promote conversation.
  • D. It is fifteen minutes or less in duration.
  • E. It is held first thing in the morning.
  • F. It is facilitated by the team lead.

正解: B,D

 

質問 89
The Daily Scrum is an event that happens every day. What would be three key concerns if the frequency
were to be lowered to every two or three days? (Choose three.)

  • A. The Scrum Master loses the ability to update the Gantt chart properly.
  • B. Too much work is spent updating the Scrum board before the meeting.
  • C. Impediments are raised and resolved more slowly.
  • D. The Product Owner cannot accurately report progress to the stakeholders.
  • E. Opportunities to insect and adapt the Sprint Backlog are lost.

正解: C,D,E

 

質問 90
The Product Backlog is ordered by:

  • A. The Product Owner with the most valuable items placed at the top.
  • B. Items are randomly arranged.
  • C. Size, where small items ale at the top and large items are at the bottom.
  • D. Risk, where safer items are at the top, and riskier items are at the bottom.

正解: A

 

質問 91
The length of a Sprint should be:

  • A. Short enough to keep the business risk acceptable to the Product Owner.
  • B. Short enough to be able to synchronize the development work with other business events.
  • C. All of these answers are correct.
  • D. No more than one calendar month.

正解: C

解説:
Explanation/Reference:

 

質問 92
The Development Team should have all the skills needed to:

  • A. Complete the project within the date and cost as calculated by the Product Owner.
  • B. Turn Product Backlog items into an Increment of potentially releasable product functionality.
  • C. Do all of the development work, except for specialized testing that requires additional tools and environments.

正解: B

解説:
Explanation

 

質問 93
Which Scrum Values are exhibited by not building Product Backlog items that have low business value? (Choose three.)

  • A. Economic Value Added.
  • B. Earned Value.
  • C. Focus.
  • D. Courage.
  • E. Respect.

正解: C,D,E

 

質問 94
Which topics should be discussed in the Sprint Review? (Choose the best answer.)

  • A. All of the above.
  • B. The Scrum process, and how it was used during the Sprint.
  • C. The product Increment.
  • D. Coding and engineering practices.

正解: C

 

質問 95
......

PSM-I試験問題無料PDFダウンロード 最近更新された問題です:https://www.jpntest.com/shiken/PSM-I-mondaishu

PSM-I認定試験問題集には199練習テスト問題:https://drive.google.com/open?id=15xJzz2Ip8I2IQnAwrB1zqUgEHobvF7Hp

弊社を連絡する

我々は12時間以内ですべてのお問い合わせを答えます。

オンラインサポート時間:( UTC+9 ) 9:00-24:00
月曜日から土曜日まで

サポート:現在連絡