[2023年最新] リアルなAPICS問題集を使って 100%無料CPIM試験問題集 [Q206-Q226]

Share

[2023年最新] リアルなAPICS問題集を使って 100%無料CPIM試験問題集

リアルCPIM問題集で最新のAPICS練習テスト問題集


CPIM認定を取得するためには、候補者はPart 1とPart 2の両方の試験に合格する必要があります。試験はコンピュータベースで、それぞれ150問の多肢選択問題からなります。候補者はそれぞれの試験を完了するために3.5時間の時間を持っています。試験の合格点は、それぞれ500点中300点です。

 

質問 # 206
is used to protect against timing uncertainty by planning order releases and order receipts earlier than required.

  • A. Fast order release
  • B. Lead command
  • C. Direct release
  • D. Safety lead time

正解:D


質問 # 207
In 1 week, a work center produces 85 standard hours of work. The hours scheduled are 80, and 75 hours are actually worked. Calculate the utilization and efficiency of the work center.

  • A. 97.75% and 113.33%
  • B. 93.75% and 113.33%
  • C. 93.75% and 110.33%
  • D. None of the above

正解:B


質問 # 208
Over the time span of the production plan, large changes in capacity are usually not possible. Additions or subtractions in plant and equipment are impossible or very difficult to accomplish in this period. However, some changes can be done. Which of the following are out of those variations?

  • A. People can be hired and laid off, overtime and short-time can be worked, and shifts can be added or removed.
  • B. Work can be subcontracted or extra equipment leased
  • C. Inventory can be built up in slack periods and sold or used in periods of high demand.
  • D. All of these

正解:D


質問 # 209
The process capability index combines:

  • A. process center and the statistical control into one index
  • B. process spread and the tolerance into one index
  • C. process shape and the tolerance into one index
  • D. process value and the statistical control into one index

正解:B


質問 # 210
There is difference between measurement and standards, because:

  • A. Performance standards set the goal
  • B. Performance measures set and measure the goals
  • C. Performance measures say how close you came
  • D. Standards are for market analysis

正解:A、C


質問 # 211
Poor product design can add cost to processing in the following ways EXCEPT:

  • A. the product and its components may not be designed to be made using the most economical methods impossible.
  • B. Parts may be designed so excessive material has to be removed
  • C. None of these
  • D. Parts may be designed so operations are difficult

正解:C


質問 # 212
Which of the following is NOT the method of forecasting?

  • A. intrinsic
  • B. qualitative
  • C. extrinsic
  • D. quantitative

正解:D


質問 # 213
Which of the following is an advantage of VMI?

  • A. MRP system operating costs decrease
  • B. Suppliers can leverage better information to reduce inventory levels.
  • C. The customer can usually force additional concessions from the VMI supplier
  • D. Lead-times are increased

正解:B


質問 # 214
The group works together to develop the product design so it meets the needs of the customer and can be made and delivered to the customer at low cost in a process called:

  • A. Concurrent engineering
  • B. Time-to-market engineering
  • C. Workgroup engineering
  • D. Manufactured engineering

正解:A


質問 # 215
In back scheduling, Sequence of operation, Work centers needed setup time, and runtime are included in a/an?

  • A. Route file
  • B. Work Center file
  • C. Order file
  • D. Load Sheet

正解:A


質問 # 216
Master production schedule, inventory records and bills of material are three major inputs to

  • A. Material Requirements planning (MRP) System
  • B. Capacity Requirements planning (CRP)
  • C. Manufacturing Planning and Control (MPC) Function
  • D. Production activity Control

正解:A


質問 # 217
If shippers want to reduce transportation cost, they should:

  • A. maximize density
  • B. Neither A nor B
  • C. increase the weight shipped
  • D. Both A and B

正解:D


質問 # 218
Which of the following is NOT categorized modeling approaches in SCM?

  • A. MIP Optimization Modeling:
  • B. Supply Chain Network Design Method:
  • C. Heuristic Methods:
  • D. None of these

正解:D


質問 # 219
People should not only be trained in their own jobs but should also be cross-trained in other skills and in problem solving techniques, in order to achieve:

  • A. machine adaptability
  • B. Total quality management
  • C. compound progressiveness
  • D. operator flexibility

正解:D


質問 # 220
A control chart for averages and ranges tracks which critical characteristics of a frequency distribution?

  • A. center and spread
  • B. specification limit and center
  • C. control and tolerance
  • D. shape and spread

正解:A


質問 # 221
Because of the flow system and the low work-in-process inventory,

  • A. labor into routine tasks
  • B. little build-up of work-in-process inventory
  • C. lead times are short
  • D. machinery and tooling can be specialized

正解:C


質問 # 222
Inventories are part of planning process and provide buffer against:

  • A. None of these
  • B. Demand rates
  • C. Production rates
  • D. Differences in demand and production rates

正解:D


質問 # 223
The planning horizon is usually and is reviewed perhaps .

  • A. None of these
  • B. 8-12 months, each month
  • C. 6-8 months, each month or quarter
  • D. 5-8 months, each quarter

正解:C


質問 # 224
Utilization can be determined from:

  • A. Efficiency
  • B. Historical records
  • C. Work sampling study
  • D. Both A And B

正解:D


質問 # 225
To order exactly what is needed, no more, no less, this rule is called:

  • A. Fixed-order quantity
  • B. lot-for-lot
  • C. Rigid-order rule
  • D. Permanent lot

正解:B


質問 # 226
......