質問 # 120
Which of the following points are related to bills of material?

  • A. The bill of material shows all the parts required to make one of the items
  • B. A part is defined by its form, fit or function. if any of these changes , then it is not the same part and it must have a different part number
  • C. All of the above
  • D. Each part or item has only one part number

正解:C


質問 # 121
The art charged by a carrier will also vary with the commodity shipped and will depend upon the following:

  • A. Perishability
  • B. Density
  • C. Value
  • D. All of these

正解:D


質問 # 122
A priority plan for the components needed to make the products in the Master production schedule (MPS) is called:

  • A. Production Activity control (PAC)
  • B. Material Requirements planning (MRP)
  • C. Capacity Requirement planning
  • D. All of the above

正解:B


質問 # 123
A bill is used when companies usually make more than one product and the same components are often used in several products

  • A. Multilevel bill
  • B. Indented bill
  • C. Single-level bill
  • D. Multiple bill

正解:D


質問 # 124
1. Wrong product or specification
2. Wrong amount (too little or too much)
3. Wrong shipping date (too early or too late)
These are common errors in that occur all the time and require constant attention.

  • A. Customer orders
  • B. MPS
  • C. MRP
  • D. Customer Expectations

正解:A


質問 # 125
A company ships barbecues fully assembled. The average line-haul cost per shipment is $12.50 per mile, and the truck carries 100 assembled barbecues. The company decides to ship the barbecues unassembled and figures it can ship barbecues in a truck. Calculate the line-haul cost per barbecue assembled and unassembled. If the average trip is 300 miles, calculate the saving per barbecue?

  • A. $0.125, $0.125 and $30.00
  • B. $0.127, $0.124 and $30.00
  • C. $0.125, $0.125 and $30.00
  • D. $0.126, $0.125 and $30.00

正解:D


質問 # 126
Which of the following is the right calculation for obtaining the net requirements?

  • A. Gross Requirement / Available inventory
  • B. None of the above is true
  • C. Gross Requirement x Available inventory
  • D. Gross Requirement - Available inventory

正解:D


質問 # 127
The planning horizon is the time span for which plans are made. It must cover a period at least equal to the time required to accomplish the plan. For Mater production scheduling, the minimum planning horizon is:

  • A. The difference between the productions of two different batches
  • B. The shortest lead time
  • C. The longest cumulative or end-t-end lead time (LT)
  • D. None of these

正解:C


質問 # 128
are determined by the computer's material requirement plan logic based upon the gross requirements for a particular part.

  • A. Open order file
  • B. Operational plan
  • C. None of the above
  • D. Planned orders

正解:D


質問 # 129
Dependency in MRP can be

  • A. Vertical
  • B. Horizontal
  • C. None of the above
  • D. Both A & B

正解:D


質問 # 130
Important way to resolve conflicting objective is:

  • A. All statements related ones.
  • B. Integrated materials management or logistics organization
  • C. Balance conflicting objectives to minimize the total of all costs involved
  • D. To provide close coordination of the supply, production and distribution functions.

正解:A


質問 # 131
When a calculation is made to find out how many are needed, the quantities available must be considered in:

  • A. Inventory records
  • B. Maintaining the bills of material structures
  • C. Linkage between manufacturing planning and control system
  • D. Both A & C

正解:A


質問 # 132
The percentage of time that the work center is active compared to the available time is called:

  • A. Work center utilization
  • B. Work center efficiency
  • C. Work center availability
  • D. Work center production

正解:A


質問 # 133
The immediate or most current period is called

  • A. Time buckets
  • B. Planning horizon
  • C. Action bucket
  • D. Both a & B

正解:C


質問 # 134
What is based on the participation of all members of an organization in improving processes, products, services, and the culture they work in is called:

  • A. Continuous Process Management
  • B. Workflow Management
  • C. Total Quality Management
  • D. All of the above

正解:C


質問 # 135
When a company is pursuing a program to achieve manufacturing excellence, which of the following objectives should receive the highest priority?

  • A. volume flexibility
  • B. cost reduction
  • C. delivery reliability
  • D. quality improvement

正解:D


質問 # 136
What occurs when the cost of ordering equals the cost of carrying?

  • A. Predetermined carrying cost
  • B. Economic-order quantity
  • C. Exact-order completeness
  • D. Ordering cost quantity

正解:B


質問 # 137
Which four primary plant types are defined, and they are used to specify the flow of materials through a production process?

  • A. I-plant, A-plant, V-plant, T-Plant
  • B. A-plant, D-plant, B-plant, F-Plant
  • C. C-plant, K-plant, B-plant, S-Plant
  • D. I-plant, A-plant, B-plant, G-Plant

正解:A


質問 # 138
Production activity control in intermittent manufacturing is complex Because of:

  • A. The number of products made
  • B. All of the above
  • C. The variety of routing
  • D. Scheduling problems

正解:B


質問 # 139
Providing a routine method for regularly updating item forecasts is known as:

  • A. Stable trend smoothing
  • B. Steady smoothing
  • C. Regular smoothing
  • D. Exponential smoothing

正解:D


質問 # 140
What may vary depending upon the interest rates, the credit rating of the firm, and the opportunities the firm may have for investment?

  • A. Normal cost
  • B. Inventory cost
  • C. Item cost
  • D. Capital cost

正解:D


質問 # 141
The annual cost and effort expended in orders placed, not on the quantity ordered.

  • A. Purchase order cost
  • B. Set-up control
  • C. Production control
  • D. Capacity control

正解:C


質問 # 142
Production planning includes;

  • A. Material Requirement planning and capacity planning
  • B. Forecasting
  • C. All of these
  • D. Master planning

正解:C