質問 101
Planning horizon means

  • A. None of the above
  • B. The most current period in the record
  • C. The quantity of the records
  • D. The number of periods in the record

正解: D

 

質問 102
Dependency in MRP can be

  • A. None of the above
  • B. Both A & B
  • C. Vertical
  • D. Horizontal

正解: B

 

質問 103
The concept of removing faults at the first instance and making a process or product "fool proof" is known as:

  • A. None of the above
  • B. Scrap step
  • C. Poke-yoke
  • D. Statistical sole

正解: C

 

質問 104
Which method influences the risk of damage and breakage?

  • A. Perishability
  • B. value
  • C. Packaging
  • D. density

正解: C

 

質問 105
What consist of a series of operations required to make the item?

  • A. procedures
  • B. builds
  • C. All of the above
  • D. routing

正解: D

 

質問 106
is the amount of work that can be done in a specified time period.

  • A. Role
  • B. Capacity
  • C. Scope
  • D. Size

正解: B

 

質問 107
Acme Chemical Company has a price order winner, which actions are consistent with this advantage?

  • A. combination production strategy, freight consolidation, and incoming inspection
  • B. level production strategy,freight consolidation, and SPC
  • C. chase production strategy, freight consolidation, and kaizan teams
  • D. level production strategy, LTL transport, and incoming inspection

正解: B

 

質問 108
The information for the CRP inputs can be obtained from:

  • A. Routing and work center file
  • B. Open order fie
  • C. All of these
  • D. MRP

正解: C

 

質問 109
Goods making up a single order are brought together and checked for omissions or errors, this is known as:

  • A. Marshal the shipment
  • B. Dispatch shipment
  • C. Operate the shipment
  • D. Receive the shipment

正解: A

 

質問 110
What includes the functions of establishing specifications, selecting suppliers, price determination, and negotiation?

  • A. None of the above
  • B. Supplier scheduling
  • C. Procurement
  • D. Competitive follow-up

正解: C

 

質問 111
Stock, from which withdrawals are made, can be located close to the marshalling and shipping area is referred to as:

  • A. Working stock
  • B. Withdrawal stock
  • C. Marshalling stock
  • D. Active stock

正解: A

 

質問 112
A schedule (priority plan) that establishes to show the components required at each level of the assembly and based on lead time, calculates the time when these component will be needed called:

  • A. Inventory control Planning
  • B. Master Production Schedule
  • C. B & C
  • D. Material Requirements Planning

正解: D

 

質問 113
The amount or permissible variation between an inventory record and a physical count is called:

  • A. Common Fluctuation
  • B. Charity
  • C. Variable Charity
  • D. Tolerance

正解: D

 

質問 114
Purchasing and production activity control:

  • A. the level of detail is high since it is concerned with individual components, workstations and ordered
  • B. All of these
  • C. Plans are reviewed and revised daily
  • D. is very short, perhaps from a day to month

正解: B

 

質問 115
Over the previous four weeks, a work center produced 120, 130, 150,140 standard hours of work. What is the demonstrated capacity of the work center?

  • A. 135 standard hours
  • B. 139 standard hours
  • C. 140 standard hours
  • D. 130 standard hours

正解: A

 

質問 116
Inventories are part of planning process and provide buffer against:

  • A. Production rates
  • B. Demand rates
  • C. Differences in demand and production rates
  • D. None of these

正解: C

 

質問 117
Process specifications are step-by-step set of instructions describing how the product is made this information is usually recorded an:

  • A. A route sheet
  • B. Process sheet
  • C. A Routing file
  • D. Both A& B are the same

正解: D

 

質問 118
Identify the problem, generate ideas about main causes of problem, brainstorm all possible causes for each main cause and try to identify the most likely root cause are all the steps of:

  • A. Component diagram
  • B. Pareto diagram
  • C. Schematic of a process
  • D. Cause-and-effect diagram

正解: D

 

質問 119
Which of the following is NOT the role that warehouses serve?

  • A. Cubic space
  • B. Service
  • C. Product mixing
  • D. Transportation consolidation

正解: A

 

質問 120
On the average a firm has 10 weeks of work-in-process and annual cost of goods sold is $15 million. Assuming that, the company works 50 weeks a year. What is the dollar value of the work-in-process?

  • A. 1,500,000
  • B. 1,000,500
  • C. 1,000,000
  • D. None of these

正解: A

 

質問 121
A manufacturer has the alternative of making parts in-house or of buying them from an outside supplier. Reason/s to buy out may be:

  • A. Allows the firm to concentrate on its own areas of specialization
  • B. Uses specialized expertise of suppliers
  • C. All of these
  • D. Requires less capital investment

正解: C

 

質問 122
The formula for the seasonal demand is:

  • A. Seasonal demand = (seasonal index) - (deseasonalized demand)
  • B. Seasonal demand = (seasonal index) / (deseasonalized demand)
  • C. Seasonal demand = (seasonal index) * (deseasonalized demand)
  • D. Seasonal demand = (seasonal index) + (seasonalized demand)

正解: C

 

質問 123
Planning bill does not represent

  • A. None of the above
  • B. Average product
  • C. Buildable products
  • D. Product structure looks

正解: C

 

質問 124
If a company makes wooden tables, the demand for the tables is called

  • A. None of the above
  • B. Independent Demand
  • C. Dependent Demand
  • D. Both A & B

正解: B

 

質問 125
......