質問 64
When trying to find all possible causes of a problem, which of the following tools would be useful?
I. Systematic troubleshooting and brainstorming.
II. Fishbone diagrams and histograms.
III. Checklists and scatter diagrams.
IV. Control charts and graphs.
- A. I, II and IV only
- B. I, II, III and IV
- C. I and IV only
- D. II, III and IV only
正解: B
質問 65
A box contains 27 black and 3 red balls. A random sample of 5 balls is drawn without replacement. What is the probability that the sample contains one red ball?
- A. 0.500
- B. 0.369
- C. 0.270
- D. 0.108
正解: B
質問 66
A process is normally distributed with a mean of 200 and a variance of 25. One item is randomly selected, what is the probability of this item having a value greater than 210?
- A. 0.0375
- B. 0.0012
- C. 0.0228
- D. 0.3446
正解: C
質問 67
An electronics firm was experiencing high rejections in their multiple connector manufacturing departments. "p" charts were introduced as part of a program to reduce defectives. Control limits were based on prior history, using the formula:
P' is the historical value of percent defective and n is the number of pieces inspected each week. After six weeks, the following record was accumulated
1,000 pieces were inspected each week in each department. Which department(s) exhibited a point or points out of control during this period (round off calculations to nearest tenth of a percentage point)?
- A. Department 104.
- B. Department 106.
- C. Department 105.
- D. All of the department.
正解: D
質問 68
Failure mode, effect, and criticality analysis, (FMECA) is primarily for the purpose of
- A. Determining the cause of a failure, by dissecting the item, to help obtain corrective action.
- B. Learning as much about the item as possible after qualification test.
- C. Determining the way an item will most likely fail to help obtain design and procedural safeguardsagainst such failures.
- D. Determining, by extensive analysis, the reliability of an item.
正解: C
質問 69
A bin contains 40 pills with a weight of 3.1 gm. each, 30 pills weighing 3.2 gms each and 10 pills weighing
3.3 gms each. The weight of an average pill is found from
- A. Option B
- B. Option A
- C. Option D
- D. Option C
正解: C
質問 70
A vendor may be audited both before and during the execution of a contract. During such a vendor
audit, the focus may be directed at the management and resource management of the company. Which of the following areas would be EXCLUDED during such an audit?
- A. Defined quality responsibilities.
- B. Company philosophy and organizational charts.
- C. Design and process capabilities.
- D. Use and planning of time, manpower and training.
正解: C
質問 71
In most cases, an improvement team facilitator will NOT normally:
- A. Function as the group leader.
- B. Summarize key ideas generated by the group.
- C. Provide feedback to the group.
- D. Be familiar with problem solving techniques.
正解: A
質問 72
The AQL for a given sampling plan is 1% this means that
- A. All lots are 1% defective or better.
- B. The producer takes a small risk of rejecting product which is 1% defective or better.
- C. The average quality level of the plan is 1%.
- D. All accepted lots are 1% defective or better.
正解: B
質問 73
Two advantages of process mapping are the ability to
I. Visualize the process being described.
II. Discover manufacturing problems only.
III. Discover quality problems only.
IV. Check current processes for duplication or redundancy.
- A. I and III only
- B. II and III only
- C. II and IV only
- D. I and IV only
正解: D
質問 74
A system was designed with 3 capacitors. When the system is first activated all capacitors are operating. The system continues to operate as long as at least 1 capacitor is operating. This is an example of
- A. A standby parallel system.
- B. Redundancy.
- C. An active parallel system.
- D. A series system.
正解: C
質問 75
What is the standard deviation of the values below?
4.5, 5.1, 6.2, 2.1, 3.9
- A. 2.087
- B. 1.136
- C. 1.522
- D. 1.362
正解: D
質問 76
Which of the following parties, traditionally initiates an audit?
- A. The client.
- B. The auditee.
- C. The plant manager.
- D. The lead auditor.
正解: A
質問 77
When asked to make recommendations on how to correct any deficiencies noted in the exit report, the auditor(s) should
- A. Make the best recommendation possible.
- B. Offer no specific advice and few suggestions.
- C. Confer with the client first.
- D. Avoid a recommendation in writing but help the auditee of possible.
正解: B
質問 78
What distribution is used to determine the OC curve for an attributes sampling plan?
- A. Binomial.
- B. The binomial or the hypergeometric distribution.
- C. Exponential.
- D. Normal.
正解: B
質問 79
The descriptive name for a fishbone or Ishikawa diagram is which of the following?
- A. Cause and effect diagrams.
- B. Flow charts.
- C. Scatter diagram.
- D. Pareto diagram.
正解: A
質問 80
......